Gongyi Xiaoyi Jinwang Machinery Factory

Gongyi Xiaoyi Jinwang Machinery Factory

The wet pan gold mill

2022 08/16

The energy efficient wet pan gold mill machine mining pan mill for sale is consist of roller and pan as the main working parts of a broken material crushing or mixing equipment.
Grinding machine is mainly used for gold, silver, lead, zinc, iron, molybdenum, copper, antimony and other minerals, mines which ball grinding mill can choose, wet grinding machine can be used.We do our best to meet your need.
High efficiency and saving energy,high output,the product is used for iron ore tailings in the process of recovery,do not make the loss of the ore power,so that the effective resources can be fully utilized.
Main technical parameters
Model
900
1000
1200
Dia of grinding wheel(mm)
900±10
1000±10
1200±10
Thickness of grinding wheel(mm)
180±10
200±10
200±10
Dia of grinding pan(mm)
1700±10
1700±10
1800±10
Thickness of grinding pan(mm)
80±10
90±10
90±10
Working surface of wet pan mill(mm)
250±10
250±10
250±10
Max.feed size (mm)
<15
<20
<25
Rotation speed (r/min)
10-13
13-15
17-19
Power (kw)
3
5.5
7.5
Weight (T)
3.2
4.5
5.5
Handling capacity(t/h)
0.6
0.8
2
Features for wet pan mill
It has a high density, strength, and no porosity ratio.
Energy efficient, high output.
Product detail

The selection method and process of energy efficient wet pan gold mill machine mining pan mill for sale machine in gold

1. After the installation and commissioning of the machine, add about 5 kilograms of mercury to the bottom of the gold mill, and begin normal work.

2 .Each shift collect gold sand, when turn to next shift, add 1 kg of mercury, and collect the gold sand and mercury at the bottom of the gold mill, collect the mercury to the machine that place the gold, use of high density red cloth wrapped mercury and twisted the cloth, open the cloth then the gold is gold sand left.

3 .It is ok when starting each shift to add one kilogram of mercury. Containing one kind is to catch a gold cloth or catch a gold blanket back and then put on a mercury board can receive the gold.
Application
1.The wet pan gold mill must be on normal working ,before start feeding.
2. If it interrupt at boot time ,please first clean up the residual ore in the middle of the milled slot and then start.
3. It should be uniform feeding,it is better to use feeder.
4. Often check whether the machine screws loose.
5. If the bearing is damaged ,replaced it immediately, in case of damage other parts.
6. Pay attention to the abnormal sound and missing part during machine operation,Stop immediately when the temperature is too high, the motor current is too large.
7. To ensure safety ,please remove the motor belt during machine maintenance.
Packing & Delivery